Reply To: Renovation Projects

00_Home 00_Pro Forum ConDoc 4 Renovation Projects Reply To: Renovation Projects

#18043
Mike Brightman
Keymaster

Hello Gregory!  We have changed the way the existing conditions/demo plan works… here is the new workflow.

  • create existing conditions model / drawings
  • save existing conditions, then save as proposed conditions
  • instead of deleting entities, move them from the existing group to the demolished group
  • add your new design in the new groups

This leaves a true record of your existing conditions, so if you goof something up you can always track down the original.  The proposed conditions model can create all of the plans you need…

  • existing + new = proposed
  • existing + demolished = existing conditions
  • existing + demolished (dashed) = demolition plan

Let me know if this helps!