Reply To: Demolish a Window

00_Home 00_Pro Forum Reply To: Demolish a Window

#32652
Mike Brightman
Keymaster

Think of it like you would actually demo and build…  First, you need to demolish existing walls/objects by moving them into the corresponding demolish layer.  The existing layer in your proposed conditions model is “existing to remain”.  Then you need to build up your design in the new layer.

Seams between the groups can be hidden by placing the edges on the “visual merge” layer.

I typically pull my existing conditions drawings from the existing conditions model, proposed conditions drawings from the proposed conditions model.  This allows a little more freedom in the proposed conditions…