I’m starting a new model where we are using a pre engineered metal frame system. The columns/posts of these frames are continuous from foundation to roof so some of these columns will be exterior and interior as this is on a down slope lot and the back of the house is approx 20′ in the air with the continuous columns supporting. Would I split these columns in a stack based on level and exterior/interior condition?